
Custom work runs on a simple loop: you send a DWG, PDF or dimensioned sketch; we return a fabrication drawing with materials, weld details and de-rated pressure class; you approve; we cut. Nothing goes to the saw before the drawing comes back signed.
Extrusion welding, butt fusion and hot-gas welding are all performed by qualified welders to written procedures, with a weld log kept per assembly. Hydrostatic testing, dye-penetrant checks and third-party witnessing are available where the specification requires them.
Key features
- Drawing approval before cutting, every time
- Qualified welders working to written procedures
- Per-assembly weld log retained and supplied with the shipment
- Hydrostatic testing and third-party witnessing available
- Export crating designed around the assembly, not the other way round
