
About Us
About Our HDPE Pipe Factory in Guangzhou, China
We have made HDPE pipe in Guangzhou since 2005. Today that means a 60,000 m² plant, 18 extrusion lines, an in-house test lab and a fabrication shop — and customers in more than 60 countries who mostly found us through the last project we delivered.
See the plant for yourself
Specifications look the same on every supplier's PDF. What differs is the plant behind them — who owns the extrusion lines, whether the laboratory can hold a batch until results clear, and how much finished pipe is actually standing in the yard.
The tour here is the short version. For the long one, book a live video walkthrough on any working day and point the camera yourself.
Arrange a walkthroughAbout Us range

Factory & Equipment
60,000 m² of plant, 18 extrusion lines to DN1600, and 40,000 tonnes a year.
- 60,000 m² plant with covered storage
- 18 extrusion lines, DN20 to DN1600
- Injection moulding for fittings to DN630

Quality Control
Virgin resin only, testing on every batch, and a certificate pack with every shipment.
Learn more
Global Projects
Water schemes, tailings lines, irrigation systems and marine works across 60+ countries.
Learn more
Careers
Production, quality, fabrication, engineering and export sales roles.
Learn more
Inside the plant
How to check a supplier you have never met
Buying pipe from a factory 8,000 km away comes down to one question: is what arrives the same as what was quoted? The honest answers are boring and verifiable — who owns the extrusion lines, what gets tested and how often, what happens to a batch that fails, and whether the certificate references a resin lot you can trace.
We would rather you check than take our word for it. Book a live video walkthrough and direct the camera yourself, ask for the certificate pack from a recent shipment to a customer in your region, or arrange third-party inspection at your cost before the container is sealed. Suppliers who resist all three are telling you something.
- Producing HDPE pipe in Guangzhou since 2005, exporting to 60+ countries
- 60,000 m² plant, 18 extrusion lines, ≈40,000 tonnes annual output
- In-house laboratory with a batch-hold procedure — no release before results
- Virgin PE100 only; no regrind in pressure pipe
- Live video factory audit by appointment, camera directed by you
Frequently asked questions
- Are you a factory or a trading company?
- A factory. We own the extrusion lines, the moulding presses, the fabrication shop and the test lab, all on one site in Guangzhou. The practical difference is that lead time, tolerance and marking are ours to control rather than ours to pass along — and you can come and look, in person or on video.
- Can we visit or audit the plant?
- Yes, in person or by live video call. For a video audit our engineer carries a camera through the plant and you direct where it points, including the lab and the resin store. In-person visits need about a week's notice so we can arrange the invitation letter for your visa application.
- What happens if a batch fails testing?
- It is quarantined and does not ship. Batches are held until hydrostatic, MFR, OIT, carbon black and dimensional results clear, which is why our stated lead times include the test window rather than assuming a pass. A failed batch is reground for non-pressure applications or scrapped — it never goes into pressure pipe.
Explore the rest of the range
- HDPE PipePE100 pipe DN20–DN1600 for water, mining, drainage and marine service.
- Drainage PipeStructured wall drainage and sewer pipe, DN200–DN2600 in SN4 to SN16.
- FittingsButt fusion, electrofusion, flange adapters and fabricated specials to DN1600.
- FabricationCustom spools, manholes, tanks and OEM production built to your drawing.
- ApplicationsWhere our pipe goes — water, mining, energy, marine and more.
- ResourcesSpec sheets, SDR tables, fusion procedures, certificates and case studies.
Need a quote or a spec check?
Send us your drawing, tender document or bill of quantities. Our engineers reply within 12 working hours with pricing, lead time and a container loading plan.