A large-diameter pipe on the roller bed, the wall thickness dredging duty calls for

Applications

Dredging & Marine

Floating dredge lines, outfalls, intakes and brine discharge systems.

A large-diameter pipe on the roller bed, the bore wide enough to show the full wall thickness

HDPE dredging pipe is supplied as a system: pipe, spools, floaters, ballast and hardware sized together, with buoyancy calculations the contractor can put into a marine method statement.

We have fabricated dredge lines, outfall diffusers and seawater intakes for port, reclamation and desalination projects, and we pressure-test and mark spools before shipment so offshore assembly time stays short.

Key features

  • Dredge pipe DN200–DN1200 with flanged spool ends
  • Floaters, ballast collars, chains and shackles supplied as a set
  • Buoyancy and ballast calculations provided
  • Outfall diffuser fabrication
  • Factory pressure testing and spool marking

Frequently asked questions

How is a floating line kept at the right level in the water?
By matching floater volume and spacing to the filled weight of the pipe, which changes with slurry density. That is a calculation, not a rule of thumb, and it is why we prefer to supply pipe and floaters together. A line floated for water will sit wrong the moment it carries sand.
What holds an outfall on the seabed?
Concrete ballast collars sized so the pipe stays negatively buoyant when empty — the governing case is an empty pipe full of air, not a working pipe full of water. We supply the collars and the buoyancy calculation for the configuration we ship; the marine method statement stays with the contractor.
How is a dredge line reconfigured between jobs?
That is exactly why dredge lines are flanged rather than fused. A flanged section can be added, removed or swapped in a shift with hand tools; a fused string needs a machine, a power supply and a weather window. Outfalls and intakes are the opposite — those are fused, because nobody wants a bolted joint on the seabed.

Need a quote or a spec check?

Send us your drawing, tender document or bill of quantities. Our engineers reply within 12 working hours with pricing, lead time and a container loading plan.